Integral Wellhead

Description

Wellhead and Christmas tree products are used to monitor well pressure, adjust oil/gas well flow and prevent the release of hazardous liquid and gas from entering into air or water during drilling and oil & gas production. They can be applicable for acidizing, fracturing, water flooding and testing as well. Jereh wellhead and Christmas tree products are designed in compliance with API 6A (20th edition) and NACE MR0175. We are dedicated to providing safe and reliable wellhead equipment for global customers.                                    

Features

Jereh wellhead equipment cover a full range of wellhead and Christmas trees, casing heads and tubing head assembly, applicable for working pressure up to 15,000 psi, available in various sizes and types, including conventional wellhead, multi bowl wellhead, integral wellhead, dual tubing wellhead and ESP wellhead. 

 

As for Integral Wellhead:

  • Integral structure, compact size, less leak points

  • Easy installation, reducing time and labor

  • Casing, tubing, hanger and seal can be installed without having to installing and removing BOPs frequently. 

Specifications

Specification 2 1/16"~4 1/16"
Working Pressure 2,000~15,000psi
Working Medium Crude oil, natural gas, mud and gas (H2S or CO2)
Temperature Level K~X (-60℃~180℃)
Material Grade AA, BB, CC, DD, EE, FF, HH
Manufacturing Level PSL1~PSL3G
Performance Level PR1~PR2

Related Parts

Inquiry